Difference between revisions of "S-58 IHO Recommended ENC validation checks"
Jump to navigation
Jump to search
Vrautenbach (talk | contribs) |
Vrautenbach (talk | contribs) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
{| class="wikitable" | {| class="wikitable" | ||
| Full name | | Full name | ||
− | | [http://iho.int/iho_pubs/draft_pubs/S-58_e5.0.0/Draft_S-58_ENC_Validation_Checks_e5.0.0.pdf S-58 IHO Recommended ENC validation checks] | + | | [http://iho.int/iho_pubs/draft_pubs/S-58_e5.0.0/Draft_S-58_ENC_Validation_Checks_e5.0.0.pdf S-58, IHO Recommended ENC validation checks] |
− | |-| Version | + | |- |
+ | | Version | ||
| Edition 5.0.0 | | Edition 5.0.0 | ||
|- | |- | ||
Line 23: | Line 24: | ||
| Type of standard | | Type of standard | ||
| IHO Recommendation <br/>Instance level | | IHO Recommendation <br/>Instance level | ||
− | |||
− | |||
− | |||
|- | |- | ||
| Application | | Application | ||
Line 39: | Line 37: | ||
| S-58 should be implemented by all ENC applications. | | S-58 should be implemented by all ENC applications. | ||
|} | |} | ||
+ | |||
+ | ==See also== | ||
+ | * [[S-57 IHO transfer standard for digital hydrographic data]] |
Latest revision as of 17:38, 26 February 2017
Overview
Full name | S-58, IHO Recommended ENC validation checks |
Version | Edition 5.0.0 |
Amendments | None |
Corrigenda | None |
Published by | IHO |
Languages | English |
Online overview | http://iho.int/iho_pubs/draft_pubs/S-58_e5.0.0/Draft_S-58_ENC_Validation_Checks_e5.0.0.pdf |
Type of standard | IHO Recommendation Instance level |
Application | S-57 recommends the validation checks which producers of validation tools for Electronic Navigational Charts (ENC) should implement in their software. S-58 replaces S-57 IHO transfer standard for digital hydrographic data Edition 3.1.0. |
Conformance classes | None specified |
Implementation benefits | ENC software validates that data are conformant with the IHO S-57 ENC product specification. Conformance violations are labelled as either an error or as a warning. This is important to ensure that the correct ENC is produced and that the software is implemented according to the same standard. |
Products | S-58 should be implemented by all ENC applications. |